|
|
|||||
![]() |
|||||
|
Work on this project involved an addition, major renovation, and restoration to portions of the entire existing home. Renovation work was completed on infrastructure items such as electrical, heating, plumbing and a new Space-pac air conditioning system was installed. On the first floor, the addition provides a kitchen, breakfast area, mudroom and family room. |
![]() |
||||
|
A master bedroom suite is located on the second floor of the addition above the family room This project was honored with a Preservation Award in 2003 by the Glencoe Historic Preservation Commission. |
|||||
|
|
|||||